The Hokuriku Shinkansen line: from Nagano Station to Kanazawa Station to the Hakusan sogo railway yard (comprehensive Hakusan railway yard) (scheduled to start its operation in the 2014 fiscal year: The start of construction of Fukui Station (located in Fukui Prefecture) corresponding to the reform of the Station house for the Echizen railway line is included.) |
北陸新幹線 長野駅 - 金沢駅 - 白山総合車両基地間 (2014年度開業予定・えちぜん鉄道の駅舎改良に伴う福井駅 (福井県)の着工を含む) |