September 28, 1967: The installation of the ground equipment of ATS was completed in the section between Owada Station and Sanjo Station as well as on the local train lines of the quadruple-track sections. |
1967年(昭和42年)9月28日 大和田~三条間・複々線区間の緩行線にATS地上設備設置完了。 |