2008: It was scheduled to extend the Nanboku-Jiyu-Tsuro because the construction of a new shopping mall, which will be the biggest mall in the prefecture, is planned for the south side of the station. |
2008年(平成20年) - 南側に府内最大のショッピングモールができるため、南北自由通路を延伸させる予定(補正予算が組まれる)。 |